1. Preparation before re-inspection: Clearly identify the grade of the steel pipe to be re-inspected and its corresponding standard (e.g., GB/T 8162, GB 5310, etc.). Prepare compliant testing equipment such as a direct-reading spectrometer and tensile testing machine. Select representative re-inspection samples by batch, ensuring the sampling location meets standard requirements.
2. Execution of core testing items:
Chemical composition re-inspection: Use equipment such as a direct-reading spectrometer and infrared C-S spectrometer to accurately detect the content of core elements such as C, Si, and Mn, confirming that the deviation from the grade standard value is within the allowable range.
Mechanical property re-inspection: Conduct tensile, impact, and hardness tests to verify that indicators such as tensile strength and yield strength fully meet the performance requirements of the corresponding grade.
Metallographic structure re-inspection: Through high and low magnification metallographic testing, check for white spots and delamination defects in the low-magnification structure, and verify that the grain size and non-metallic inclusion level meet the standards.
3. Result Judgment and Traceability: Compare all test data with the corresponding national standards and material certificates one by one. If all indicators are qualified, the material re-inspection is deemed to have passed. If any single item fails, double the re-inspection can be carried out according to the rules allowed by the standard. If it still fails, the batch of material is deemed to be unqualified.